The jackhammering begins
|
The hole for the bubble tub drain begins to appear
|
The hole for the bubble tub drain begins to appear
|
The hole for the bubble tub drain begins to appear
|
The old shower drain uncovered
|
The hole for the bubble tub drain is complete
|
|
|
|
|
|
|
|
The old tub drain is removed
|
The old tub drain is removed
|
Searching for the elusive main
|
The old water pipes sunk in the slab
|
The old water pipes sunk in the slab
|
More plumbing surprises
|
|
|
|
|
|
|
|
Finally locating the elusive main
|
The tub drain prepped for removal
|
The main is discovered
|
The main is discovered
|
The old tub drain removed
|
The old shower drain. Turns out it drained the wrong direction!
|
|
|
|
|
|
|
|
The old shower drain removed
|
The hole for the new shower drain
|
The hole for the new shower drain
|
Can you believe this is the "straight" pipe for the toilet?
|
How NOT to plumb a toilet. The improperly-located pipe was bent to accomodate fixture placement
|
Words fail
|
|
|
|
|
|
|
|
How did this EVER work?
|
Evidence of post-construction plumbing repair
|
New toilet plumbing installed
|
New toilet plumbing installed
|
Connection of toilet plumbing to the new main
|
All new plumbing connects to the house main
|
|
|
|
|
|
|
|
Stub-out for new shower and tub
|
New plumbing for Leng's vanity
|
New toilet plumbing buried and ready for concrete
|
New connection to the house main buried and ready for concrete
|
New drain for the bubble tub
|
The p-trap for the bubble tub
|
|
|
|
|
|
|
|
The p-trap for the bubble tub
|
The p-trap and new drain for the shower
|
The p-trap and new drain for the shower
|
The rough-in plumbing for the shower and bubble tub
|
The rough-in plumbing for the shower and bubble tub
|
The rough-in plumbing for my vanity
|
|
|
|
|
|
|
|
The rough-in plumbing for Leng's vanity
|
The new structural steel for the foundation
|
The new structural steel for the foundation
|
The new structural steel for the foundation
|
The new structural steel for the foundation
|
The new structural steel for the foundation
|
|
|
|
|
|
|
|
Concrete is laid over the structural steel
|
Concrete is laid over the structural steel
|
Concrete is laid over the structural steel
|
Concrete is laid over the structural steel
|
Finishing the concrete
|
Patched slab for the plumbing
|
|
|
|
|
|
|
|
Patched slab for the plumbing in Leng's area
|
Patched slab for the plumbing in Leng's area
|
Patched slab for the plumbing in my area
|
Patched slab for the plumbing in my area and the toilet area
|
Plumbing fixtures installed for the shower
|
New plumbing installed for the shower fixtures
|
|
|
|
|
|
|
|
New plumbing installed for the shower fixtures
|
The final plumbing connections on the bubble tub
|
The final plumbing connections on the bubble tub
|
The bubble tub being installed on a mud bed
|
Ed installing the tub faucets
|
Ed installing the tub faucets
|
|
|
|
|
|
|
The tub faucet in full operation
|
Leng's vanity faucet installed
|
Michael's vanity faucet installed
|
The shower pan finished and ready for marble
|
The shower pan finished and ready for marble
|