The Great Renovation: Demolition

Click on the thumbnails to see an enlargement


MBR Renovation: Demolition

The door frames come down The plumbing fixtures removed The plumbing fixtures removed My vanity removed Leng's vanity removed Leng's vanity and medicine cabinet removed
My plumbing was a real mess The swansong of the vanity top The last of the vanity top The pile of rubble slowly grows Taking everything out to the studs The old ceiling joists
The old ceiling joists and wiring And the insulation came tumbling down The tub removed The underside of the tub The date of manufacture of the tub: 11-19-1970 Leng's vanity and cabinets removed
Inspecting the drain area of the old tub The drain area of the old tub The linen closet removed The walls around the tub removed More sheetrock removed The sheetrock around Leng's closet removed
The shower pan removed The remnants of the shower The sheetrock around my closet removed What's left of the tub and shower area What's left of Leng's vanity and dressing area What's left of the tub and shower area
The pile of rubble has grown substantially The pile of rubble has grown substantially The pitiful remains of my vanity and dressing area No more partition walls! The rubble pile still growing! The toilet stands alone
The area that used to be the tub The old carpet removed and ready for disposal The old carpet removed and ready for disposal The last day for the pile of rubble The last day for the pile of rubble. I wonder if I'll miss it? The rubble is gone. This room alone had 2.5 tons of material


Return to top


Questions and comments:
mbf@fritsche.org


Back to fritsche.org Renovation Table of Contents